Home / CrossFit Competitions / Guardian Games
CrossFit Team Completed

Guardian Games

Mustang, OK, United States
September 21, 2024
4
Divisions
5
Workouts
0
Likes
0
Comments
Team

About This Competition

**1st Annual Guardian Games**
 
The ultimate CrossFit competition for those that serve and protect.
Teams of 2, same sex.
RX & Scaled Divisions
 
Both competitors must be one of the following, and show valid ID to confirm.

  • Active Military Members

  • Veterans

  • Law Enforcement

  • Firefighters

  • First Responders

  • Nurses & Doctors 

 

Partners do not have to be from the same category, but must be the same sex.
 

Food trucks, vendor village, military/veteran/law enforcement organizations & raffles will be on site.
 
Grab a partner and your team of supporters! 
No refunds, but a qualifying partner can be substituted if the situation arises.

 

There will be 5 WODS, including the Floater.  Wods will be posted below as they are released.

Source: Competition Corner

More about this comp below — but before you move on...
Did you know?

Your results are already here.

Every competition you've entered, ranked workout by workout. Search your name and find your entire history.

Search the Results

The conversation is already happening.

Athletes are commenting, posting photos, and reliving the workouts. Jump in.

See the Community

Ready for what's next?

Browse upcoming competitions near you — your next event is probably already listed.

Find Competitions Near Me

How much stronger are you than last year?

Log PRs for every lift and benchmark workout. Your progress tells the story — KettleBoards keeps track.

Track Your PRs
Free to join — no credit card required. Create Account

Divisions

RX Female
Team · Team
RX Men
Team · Team
Scaled Female
Team · Team
Scaled Men
Team · Team

Top Results

Top 5 finishers per division. View full results →

RX Female
# Athlete Points
1 The Pink Ladies 5
2 Sugar & Spice 10
3 Warrants that Workout 15
Scaled Female
# Athlete Points
1 Burpees and beers 8
2 Code Brown! 8
3 Master Gators 14
Scaled Men
# Athlete Points
1 X Force 8
2 Average All Around 9
3 Buns and Guns 14
4 Old Rx 19

Workouts

Min 0-5 Partner 1:

1 Snatch (from the ground) + 1 Hang Snatch + 1 Overhead Squat.

 

Min 5-10, Partner 2:

1 Clean (from the ground) + 1 Hang Clean + 1 Front Squat

 

Score =  Heaviest successful weight for both teammates combined.

Notes: Snatches & Cleans can be received in either the power position or the squat position.

RX

AMRAP7

1,2,3,4 ETC Ascending reps of:

Shared Barbell Deadlifts 315/215

Handstand Pushups*

*Partner 2 is holding a handstand while P1 does HSPU.*

 

 

 

Notes:

For the shared barbell deadlifts, both partners will be deadlifting the same barbell, at the same time, side by side.

Handstand pushup reps start with arms fully extended while inverted. 

 

 

Scaled:

AMRAP7

1,2,3,4 ETC Ascending reps of:

Shared Barbell Deadlifts 225/155

Dual DB Shoulder to Overhead 35/20*

*Partner 2 holds plank with feet on 20" box during S2OH.

 

Notes:

For the shared barbell deadlifts, both partners will be deadlifting the same barbell, at the same time, side by side.

 

PARTNER 1: 3 fat bar power cleans, then holds the front rack position until PARTNER 2 completes a 500ft sled push. Once sled is finished, partners switch and repeat.

 

If front rack is broken, sled must stop until it’s back into front rack position. There is a 3 clean penalty each time front rack is broken.

 

7 MIN CAP.

 

BARBELL: 135/95 RX, 95/65 SCALED.

SLED WEIGHT: 90/45 RX, 70/25 SCALED.

This wod will be released at the competition.

Media

No media yet. Be the first to add a photo!

Community

Event Details

Date
September 21, 2024
Location
Mustang, OK, United States
185 N. Centennial Way
Format
Team
Type
CrossFit
Registration
Opens: Jun 1, 2024
Closes: Sep 12, 2024
Source
Competition Corner

Find Your Next Competition

Browse hundreds of CrossFit and functional fitness competitions worldwide.

Browse All Competitions
0%
Preparing upload...
To post a comment, log in.

Our goal is to bring the functional fitness competition community together. Organizing information and bringing valuable resources to the space.

Useful Links

Our Contacts

Report Comment

Why are you reporting this comment?

Spam
Misleading or repetitive content
Harassment or Bullying
Targeting or attacking someone
Hate Speech
Discriminatory or offensive language
Violence or Threats
Promotes or threatens violence
Inappropriate Content
Nudity, sexual content, or graphic material
False Information
Spreading misinformation or fake news
Other
Something else that violates our guidelines

Sign In Required

You need to be logged in to use this feature. Don't have an account yet? It's free to join!

Sign In Create Free Account